Add a part to the master catalog.
Kind
Raw part
Ordered from a vendor. Tracked by lot.
Sub-assembly
Built from other parts. Consumed into a parent (e.g. MERLIN-PAYLOAD, SOLAR-PANEL-ASSY).
Shippable product
The final boxed thing that ships to Dispatch (e.g. MERLIN).
Bulk consumable
For hardware like bolts, screws, and cable ties that you don’t need to trace to a specific shipment during builds. Lot will be auto-deducted via FIFO at build-start.
How many you have on the shelf right now. Creates an initial received lot (PART-OPENING-2026-05-27) so stock counts reflect reality from day one. You can cycle-count the lot later if the number was off.
PART-OPENING-2026-05-27